Monday, April 21, 2008

All Systems Go

Days 8 & 9: April 18 & 21, 2008


Venting that apparently goes out the roof.


Not sure what this does but it is no longer in my basement. I am wondering if it is a water pressure gauge of some sort?
Aaron informed me that the rough-in passed inspection so they were able to back-fill the giant holes in the basement and fill with concrete. He says it is possible the shower will be installed by Thursday!


The left of the pole will be the entrance to the bathroom. I am still debating between a standard swing door and a pocket door.


This is where the vanity sink will live.

No comments: