Sunday, April 27, 2008

29 Cu

Day 12: April 25, 2008
The goal of the washer and dryer being connected by the time I returned from Atlanta was not met. Aaron was going to do a temporary set-up but I passed since I was able to do laundry at a neighbor's house since we were dog sitting this weekend. The plumbers tell me that everything should be in place on Monday, April 28. Sorry, but I am not holding my breath.

The copper supply lines have been added for the washing machine.


The supply lines for the shower appear to be plastic tubing.