Here is where we stand for both projects:
Main Floor Bathroom
- one more coat of paint on the ceiling
- toilet, sink and faucet installation
- vent cover installation
- bathtub refinishing
- towel and paper bar installation
- shower curtain rod installation and new shower curtain purchase
Kitchen
- too many things to list!
Yay! We have a ceiling and two walls! No more exposed insulation! I can see a glimmer of light at the end of the dark, dirty tunnel!
This wall is turning out to be a big problem - more specifically the heat duct is a big problem. Aaron and his friend Brad are suggesting that we move the refrigerator closer to the range and lose about 4" of cabinet/counter on each side of the range. However, in doing so, we could have a pantry where the heat duct is located (which is what the original kitchen featured).